City of North Las Vegas logo
City of North Las Vegas
CONSTRUCTION BID ADVERTISEMENTS

Welcome to the Construction Bid Advertisements Web page. Below is a list of recent and pending projects that have been authorized for construction bidding, with the newest bid posted at the bottom of the table.

This information includes the following: bid number, project name (Notice Inviting Bid), plan costs, prebid date and time, any additional addenda for the bid, the bid opening date and time, the results of the bid opening date and finally, and an e-mail contact.

Additional information may be found by following any of the links shown in the particular categories. The bid abstracts and results are posted for 45 days.

Bid #

Project Information
Invitation To Bid

Plans

Prebid Conference

Addenda Number and Date

Bid Opening

Contact

City Council Award Date
1320 Upper Las Vegas
Wash Trail
Phase I
Plans: $100.00 June 17, 2009 @ 10:00 a.m.

Addendum No.1
6/25/09

Addendum No.2
7/02/09

Addendum No. 3
7/7/09
(bid date changed)

July 9, 2009 @ 2:00 p.m.

Clint Fujii, P.E.
PH (702) 633-2688
Fax (702) 633-1158

E-mail Form Link

October 7, 2009

Bid Abstract
1328 Tropical Parkway Channel East Plans: $200.00 June 30, 2009 @ 10:00 a.m. Addendum No.1
7/03/09
July 14, 2009 @ 2:00 p.m.

Quang Phan, P.E.

PH (702) 633-2009

Fax (702) 633-1158

E-mail Form Link

September 2, 2009

Bid Abstract

1340 Detention Center Dormitories A, B, and F Roof Renovation Plans: $25.00 Mandatory Prebid and Site Walk through: 
June 23, 2009 @10:00 a.m.

Addendum No.1
6/30/09
July 7, 2009 @ 2:00 p.m.

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758

E-mail Form Link

August 19, 2009

Bid Abstract

1352 North 5th Street Improvements Phase 1B Plans: $200.00 August 26, 2009 @10:00 a.m.

Addendum No.1
8/20/09

Addendum No.2
9/01/09

September 15, 2009 @2:00 p.m.

Allan Fajardo, P.E., PTOE

PH (702) 633-2044

Fax (702) 633-1158  
E-mail Form Link

December 2, 2009

Bid Abstract
1354 Fire Station # 54 Addition And Remodel Plans: $150.00 September 1, 2009 @ 10:00 a.m.

Addendum No.1
9/03/09 (bid date changed)

Addendum

No. 2

9/17/09

Addendum

No. 3

9/23/09 (bid date changed)

September 15, 2009 @ 3:00 p.m.

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758
E-mail Form Link

November 4, 2009

Bid Abstract
1335 Federal Stimulus - Street Rehabilitation 2009-A Plans: $60.00 September 16, 2009 @ 10:00 a.m. Addendum
No.1
9/28/09 (Bid Date Changed)
October 6, 2009 @ 2:00 p.m.

Clint Fujii, P.E.
PH (702) 633-2688
Fax (702) 633-1158

E-mail Form Link

December 2, 2009

Bid Abstract
1348 Las Vegas Wash Trails Phase IV Plans: $45.00 November 17, 2009 @ 10:00 a.m.

Addendum
No. 1
11/23/2009

Addendum
No. 2
11/30/2009
(Bid Date Changed)

December 2, 2009 @ 11:00 a.m.

Jason Kaminski, E.I.

PH (702) 633- 2778

Fax (702) 633-2758
E-mail

January 20, 2010
Bid Abstract
1356 Dual Left Turn Lanes Improvements Plans: $60.00 December 2, 2009 @ 10:00 a.m. Addendum
No. 1
12/9/09

Addendum
No. 2
12/15/09
(Bid Date Changed)

Addendum
No. 3
12/16/09
(Bid Date Changed)
December 17 , 2009 @ 2:00 p.m. Madeleine Jabbour
madeleinej@cityofnorthlasvegas.com
PH (702) 633-1547 
Fax (702) 633-1158

April 7, 2010
Bid Abstract
1359 Detention Center Dormitory A Flooring Renovation Plans: $25.00 Mandatory Prebid and Site Walk Through December 15, 2009@10:00 AM
  January 12, 2009 @2:00 p.m.

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758
E-mail Form Link

February 17, 2010
Bid Abstract
1350 Fire Administration Building Emergency Generator and Enclosure Plans: $100.00 Mandatory Prebid and Walk-Through February 16, 2010@10:00 a.m.

Mandatory Prebid and Walk-Through changed to February 18, 2010@10:00 a.m.

Addendum
No.1
3/3/10

Addendum
No.2
2/18/10

Addendum
No.3
2/23/10

March 2, 2010@2:00 p.m.

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758
E-mail Form Link

April 21, 2010
Bid Abstract
1365 Craig Ranch Maintenance Facility Plans: $300.00 February 9, 2010@10:00 a.m.

Addendum
No.1
2/18/10

Addendum
No.2
2/22/10

February 24, 2010@2:00 p.m.

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758
E-mail Form Link

April 21, 2010
Bid Abstract
1371 Lower Detention Basin of Las Vegas Wash - Wall Repair Plans:
$50.00
March 22, 2010@10:00 a.m. Addendum
No.1
3/30/10

April 6, 2010@2:00 p.m.

 

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758
E-mail Form Link

May 19, 2010
Bid Abstract
1369 Major Street Rehabilitation FY 08/09 Plans:
$40.00
March 31, 2010@10:00 a.m Addendum
No.1
4/8/10
April 22, 2010@2:00 p.m.

Clint Fujii
PH (702) 633-2688

E-mail Form Link

June 16, 2010
Bid Abstract
1366 ADA Sidewalk Accessibility FY 09/10 Plans:
$50.00
March 30, 2010@10:00 a.m

Addendum
No.1
3/29/10

Addendum
No.2
3/30/10

April 6, 2010@3:00 p.m.

Quang Phan

PH (702) 633-2009

E-mail Form Link

May 19, 2010
Bid Abstract
1326 Tropical Breeze Park Plans:
$300.00
April 22, 2010@10:00 a.m. Addendum
No.1
4/29/10
May 4, 2010@2:00 p.m. Cliff Moss@(702) 633-2775
Mossc@cityofnorthlasvegas.com
June 16, 2010
Bid Abstract
1358 Federal Stimulus - Street Rehabilitation 2009-B Plans:
$60.00
April 28, 2010@10:00 a.m.   May 20, 2010@2:00 p.m.

Clint Fujii
PH (702) 633-2688

E-mail Form Link

July 7, 2010
Bid Abstract
1367 Simmons Street Drainage Improvements Gowan Outfall Plans:
$100.00
April 14, 2010@10:00 a.m.

Addendum
No.1
4/23/10

Addendum
No.2
4/26/10
(Bid Date Changed)

Addendum
No.3
5/6/10

April 28, 2010@2:00 p.m.

Quang Phan

PH (702) 633-2009

E-mail Form Link
July 21, 2010
Bid Abstract
1374 Kiel Ranch Adobe Restoration - Phase I Plans:
$100.00
Mandatory Prebid and Site Walk Through: June 1, 2010 @ 10:00 a.m.   June 15, 2010 @ 2:00 p.m. Cliff Moss@(702) 633-2775
Mossc@cityofnorthlasvegas.com
 
1376 Walker Park Renovations Plans:
$150.00
Mandatory Prebid and Site Walk Through: June 10, 2010 @ 9:00 a.m. Addendum
No.1
6/15/2010
June 23, 2010 @ 2:00 p.m. Cliff Moss@(702) 633-2775
Mossc@cityofnorthlasvegas.com
 
1372 Fire Station 50 Plans: $300.00 July 28, 2010 @ 10:00 a.m.

Addendum
No. 1
7/28/2010

Addendum
No. 2
8/04/2010
(Bid Date Changed)

Addendum No. 3
8/12/10
(Bid Date Changed)

August 10, 2010 @ 2:00 p.m.

Mark Rodgers, P.E., S.E.

PH (702) 633-2777

Fax (702) 633-2758

E-mail Form Link

 

As bid results are posted, under the bid opening date heading, choose the appropriate link(s) to view the results of the recorded bids. The project notice and opening results are in the Adobe Portable Document Format (PDF). The freely available Adobe Acrobat reader is required to view and print PDF files. 

Click Here to get Adobe Acrobat Reader

Notice: This data is provided for informational purposes only and should not be construed as the current official bid information. ANY reliance on this information is unreasonable and unjustified.

Bid documents may be obtained for a nonrefundable fee, as indicated in the Notice Inviting Bids, at the location indicated below. If documents are to be mailed, there may be an additional postage and handling fee. Checks are to be made payable to the "City of North Las Vegas."

Engineering Services Division
City of North Las Vegas
Public Works Department
2288 Civic Center Drive
North Las Vegas, Nevada 89030
Phone (702) 633-1206
Fax (702) 633-1158